1. Pre-test preparation: Inspect the generator set and load bank for intactness, connect the equipment as per specifications, and confirm the power supply and safety protection systems are normal.2. No-load startup: Start the generator set and run it at no load to check the idle speed, voltage, freq
READ MORESeamless Emergency SwitchoverWhen the municipal power supply is interrupted unexpectedly, the integrated ATS (Automatic Transfer Switch) triggers the generator to start up within 10–15 seconds, immediately taking over the load to provide stable power for core facilities such as servers, storage devi
READ MOREBesides the three main components—engine, alternator, and controller—some less noticeable factors can also affect the price.Bolts and nuts. Inferior bolts are prone to rusting when exposed to water and can loosen or break due to vibration.We use stainless steel bolts and nuts, and protect the canopy
READ MORE